Client: SK Tech
Project Location: Lillooet, BC

Disciplines: Structural, Mechanical
Keywords: Power Generation, Hydro, Detailed Design, Construction Support, QA
Status: Completed

EnFlux Engineering Ltd. designed a 70 inch blind flange that was installed on the inlet piping upstream of one of the Turbine Inlet Valves at the Upper Lillooet Generating Station. The flange was required to perform necessary maintence on a Turbine Inlet Valve (TIV) and allowed for the plant to return to operation using the remaining units. EnFlux provided the design specifications of the flange (Material Specifications, Flange Thickness, surface finishes, and torques for bolting), prepared detailed construction drawings and provided fabrication and installation support throughout the project.

Highlights

= Detailed design of a 70 inch blind flange for 400psi pressure,
= Preparation of fabrication and installation specifications,
= Fabrication and installation support and QA.