Hunter Creek Hydro Project: Hydraulic and Seepage assessments
Hunter Creek Hydro Project: Hydraulic and Seepage assessments
Client: WindRiver
Project Location: Hope, BC
Keywords: Power Generation, Hydro, Hydraulics, Inspection, Assessment, Dam Safety
Status: Completed
EnFlux staff were involved in the Hunter Creek Hydroelectric Project from the prefeasibility phase (Including preliminary site investigations, hydrological assessments, energy studies, environmental analysis, and conceptual designs) and detailed design to construction support and commissioning. EnFlux Engineering performed inspections of both intake structures, main and tributary intakes, and the main and tributary penstocks to review the deterioration/damage on concrete structures, changes to the hydraulic flow paths, penstock cover and condition of apurtenances such as air vents and access hatches following flood events. In addition, EnFlux performed visual inspections at both main and tributary intakes to review the civil works and seepage through the structures and inspection letters were provided along with recommended actions to be taken as part of the plant maintenance. EnFlux also provided technical support on preparation of Safe Work procedures in confined spaces defined within the power plant.
Highlights
Review of changes to hydraulic paths and flow calculations,
Seepage assessment at each intake structure and reporting, and
Review and certification of work procedures in confined spaces defined within the power plant.